Box Fill Volume Chart (NEC 314.16)

Existing NEC 314.16(B) conductor allowances and the calculator’s NEC 314.16(A) metal-box subset. Volume allowances are not a count of physical wires alone.

Coverage: 18–6 AWG: seven allowances. Twelve device/square metal boxes, 7.5–42.0 in³. Other box types are not included.

Check the marked volume and actual device fit. NEC 2020/2023 grounding allowances differ from 2017: up to four entering grounds share one allowance, with a quarter allowance for each additional ground.

NEC 314.16(B)

AWGin³
181.50
161.75
142.00
122.25
102.50
83.00
65.00

NEC 314.16(A)

Box dimensions and typein³
3 × 2 × 1½ in — device7.5
3 × 2 × 2 in — device10.0
3 × 2 × 2¼ in — device10.5
3 × 2 × 2½ in — device12.5
3 × 2 × 2¾ in — device14.0
3 × 2 × 3½ in — device18.0
4 × 1¼ in — square18.0
4 × 1½ in — square21.0
4¹¹⁄₁₆ × 1¼ in — square25.5
4¹¹⁄₁₆ × 1½ in — square29.5
4 × 2⅛ in — square30.3
4¹¹⁄₁₆ × 2⅛ in — square42.0

How to use this chart

Multiply each counted allowance by its conductor-size volume, add device/clamp/grounding allowances under the adopted edition, and compare with marked box volume.

Worked example

12 AWG requires 2.25 in³ per allowance. Eight allowances require 18.0 in³; a 4 in square × 1½ in deep box provides 21.0 in³ and passes this volume check.

Method & Sources

This is a reference chart; it does not run a calculator method.

Sources

Related calculators

FAQ

What does this chart cover?

18–6 AWG: seven allowances. Twelve device/square metal boxes, 7.5–42.0 in³. Other box types are not included.

Where do the values come from?

Existing NEC 314.16(B) conductor allowances and the calculator’s NEC 314.16(A) metal-box subset. Volume allowances are not a count of physical wires alone.

How do I read this chart?

Multiply each counted allowance by its conductor-size volume, add device/clamp/grounding allowances under the adopted edition, and compare with marked box volume.

Can you show an example?

12 AWG requires 2.25 in³ per allowance. Eight allowances require 18.0 in³; a 4 in square × 1½ in deep box provides 21.0 in³ and passes this volume check.

What limits must I check?

Check the marked volume and actual device fit. NEC 2020/2023 grounding allowances differ from 2017: up to four entering grounds share one allowance, with a quarter allowance for each additional ground.