IEC 60255 IDMT equations
The selected curve and TMS determine relay operating time at the fault-to-pickup ratio.
tSI = 0.14 TMS / [(I/Is)^0.02 − 1]tVI = 13.5 TMS / [(I/Is) − 1]tEI = 80 TMS / [(I/Is)^2 − 1]Δtg = tupstream − tdownstreamwhere:
- I
- Fault current[A]
- Is
- Relay pickup current[A]
- TMS
- Time multiplier setting
- t
- Relay trip time[s]
For Standard Inverse at 14 times pickup, TMS 0.30 gives 0.78 s and TMS 0.15 gives 0.39 s, leaving a passing 0.39 s margin.
How to calculate IDMT relay trip time
Divide fault current by pickup current, select the IEC curve, and apply TMS to the curve equation. The time is the relay operating target before additional coordination allowances.
- Select Standard, Very, or Extremely Inverse.
- Enter pickup current, fault current, and both TMS values.
- Review up/downstream times and margin.
- Confirm relay-specific curves and tolerances.
Worked Standard Inverse example
For Is = 400 A, I = 5,600 A, and I/Is = 14, upstream TMS 0.30 gives about 0.78 s and downstream TMS 0.15 gives about 0.39 s. The resulting 0.39 s margin passes the 0.30 s target.
| Curve | Formula | Use |
|---|---|---|
| Standard Inverse | t = 0.14 TMS / [(I/Is)^0.02 − 1] | General overcurrent grading |
| Very Inverse | t = 13.5 TMS / [(I/Is) − 1] | Faster at high fault current |
| Extremely Inverse | t = 80 TMS / [(I/Is)^2 − 1] | Steep inverse characteristic |
Method & Sources
Method
Formula used
tSI = 0.14 TMS / [(I/Is)^0.02 − 1]tVI = 13.5 TMS / [(I/Is) − 1]tEI = 80 TMS / [(I/Is)^2 − 1]Δtg = tupstream − tdownstream
Input basis
The selected curve and TMS determine relay operating time at the fault-to-pickup ratio.
- IEC inverse-time curve
- Pickup current Is [A]
- Fault current I [A]
- Upstream TMS
- Downstream TMS
- Required grading margin [s]
- I — Fault current [A]
- Is — Relay pickup current [A]
- TMS — Time multiplier setting
- t — Relay trip time [s]
Units
A · s
Display and rounding
No separate display or rounding rule is stated on this page.
Scope and limits
- The relay follows the stated IEC 60255 equation constants and the fault current is steady during the calculated trip interval.
- Upstream and downstream relays use the same curve and pickup current in the grading comparison.
- Grading margin equals upstream trip time minus downstream trip time at the entered fault current.
- Relay tolerance, CT error, saturation, breaker opening time, arc time, reset ratio, and fault X/R ratio can change the required setting.
- This is not a complete protection coordination study or proof of selective operation across the full fault-current range.
- For Standard Inverse at 14 times pickup, TMS 0.30 gives 0.78 s and TMS 0.15 gives 0.39 s, leaving a passing 0.39 s margin.
Sources
- IEC 60255, inverse-time overcurrent relay equationsEdition not stated on this page; clause and table identifiers are preserved verbatim.
Coordination and CT checks
Use short-circuit current and CT burden tools to establish the current seen by each relay and confirm that the CT remains suitable over the grading range.
Why the margin needs a full study
A calculated time difference is not proof of selectivity. Relay tolerance, CT performance, breaker clearing, arc duration, reset, and the full current range must be included.
Assumptions
- The relay follows the stated IEC 60255 equation constants and the fault current is steady during the calculated trip interval.
- Upstream and downstream relays use the same curve and pickup current in the grading comparison.
- Grading margin equals upstream trip time minus downstream trip time at the entered fault current.
Important Warnings
- Relay tolerance, CT error, saturation, breaker opening time, arc time, reset ratio, and fault X/R ratio can change the required setting.
- This is not a complete protection coordination study or proof of selective operation across the full fault-current range.